Blythewood, SC - Standby Power Upgrade – Design-build construction for installation of (3) 1,500 kW generators with paralleling gear and associated distribution in South Carolina. Upgrades performed in a live data center with no interruption to critical load.
Blythewood, SC - UPS Upgrade – Design-build construction for installation of (4) x 800 kVA parallel redundant system with new utility service and associated distribution in South Carolina. Upgrade was performed and commissioned without interruption to the existing critical load.